Great Bridge – winners

Matic Ledinek
Deadline Murko
At Lesic

idea

Lok has been in the form of a catenary.

They focused mainly on the interface elements.

It was decided to produce a bridge to the lower limit of the permitted weight (604 g). Their weakness structure was primarily a large aspect ratio.

slika5

Load capacity is assumed to 15 kg.

Slika6

Share This