Pravila 2014

Material

Material competitors will receive the competition

Time in geometrija

The range 70 cm

The maximum height above the zero line 25 cm

Maximum altitude below the zero line 5 cm

The maximum width of the bridge 15 cm

traffic profile : v/š = 5/8 cm (control will be carried out with box)

The mass is between 600 in 800 g (including grants, tiles, rope,…)

pravila214

 ,en

The technical part

Concentrated load at midspan

The measurement of displacements in the middle two quarters of the range (Attention to the correct location of measuring tile)

Point burst will apply, when he started with the F-diagram fall. For capacity will be considered the highest point on the chart

Victory Bridge with the highest ratio of load / mass

If the bridge will not be demolished, the payload capacity is considered the maximum force is reached in the piston

Traffic profile bridge must be free-bright space at least 5/8 cm

Last day to produce a short 5-10 minute presentation, which includes the presentation of the teams and the presentation of ideas and design bridge

The rules in building

The use of power tools is prohibited (except for glue guns)

The use of adhesive tape, gumic, knives, rulers, template, linings for help

The use of computer programs to model preparation

The use plans as a basis for the work

Spaghetti in the elements may not be composed by gluing along the spaghetti. Bonding is permitted on the edges of spaghetti or the shortest distance between the adhesive 3 cm. The width of the glue can be a maximum of 1 cm.